Extended Scope of Work/Notes:
|
(RW4) Replace 4” HDPE sewer lateral line from Building 50 with an offset to meet main elevation drop at 100 Chevron Way, RTC, related to B24-01753
(RW4) (RW4) Sewer Lateral for 11/16/2024-11/172024
(RW3) Weekend overtime Approved 02/01/2025-02/02/2025, and 02/08/2025-02/09/2025 tallying 32 hrs.
|