Extended Scope of Work/Notes:
|
BREEZEWAY END FLASHINGS – REMOVE STUCCO FROM AROUND BEAMS AT THE ENDS OF THE BREEZEWAYS. INSTALL A 26 GA BONDERIZED SOLDERED FLASHING AROUND BEAM. INSTALL NEW BUILDING PAPER, INTEGRATED WITH EXISTING FOR TIE IN. INSTALL NEW LATHE AND WEEP SCREED. INSTALL BASE COAT OF STUCCO. INSTALL TOPCOAT OF STUCCO AND TEXTURE. PRIME AND PAINT TO MATCH.
WINDOW HEAD FLASHINGS – AT LOCATIONS DIRECTED BY OWNER, REMOVE STUCCO FROM TOP OF EXISTING WINDOW. INSTALL NEW BONDERIZED, SOLDERED HEAD FLASHING. INSTALL SAM. INSTALL NEW BUILDING PAPER, INTEGRATED WITH EXISTING FOR TIE IN. INSTALL NEW LATHE AND WEEP SCREED. INSTALL BASE COAT OF STUCCO. INSTALL TOPCOAT OF STUCCO AND TEXTURE. PRIME AND PAINT TO MATCH.
IMBEDDED DECK BOARDS – REMOVE DECK BOARDS THAT ARE EMBEDDED INTO STUCCO AT DECKS ON THE FIRST FLOOR ONLY. PATCH STUCCO AT THE ENDS WHERE THERE IS A VOID. PRIME AND PAINT STUCCO. REINSTALL DECK BOARD.
|