Extended Scope of Work/Notes:
|
SONIC TO PLACE STRAND, FIBER OPTIC CABLE, ANCHORS AND GUY WIRES, TO BUILD OUT INFRASTRUCTURE NETWORK TO PROVIDE INTERNET SERVICE TO NEW OR EXISTING CUSTOMERS. INSTALLATION OF FORTY FIVE NEW POLES IN VARIOUS LOCATIONS. SPECIAL CONDITIONS: To the extent that the proposed work involves the installation of a temporary bypass pole, the Permittee shall transfer, or cause to be transferred, all the existing utilities from the bypass pole to a permanent utility pole within the following limitation period after the bypass pole is installed: (i) 12 months if installed in a residential zone; (ii) 18 months if installed in a commercial zone; or (iii) 24 months if installed in an industrial zone. The transfer of utilities from the bypass pole to a permanent pole in any other zoning district shall be subject to the 18-month limitation period or the limitation period for the nearest adjacent zoning district, whichever is shorter. Within 30 days after the utilities have been transferred from the bypass pole to the permanent pole, the applicant shall remove, or caused to be removed, the bypass pole and restore the surrounding area to the Director’s satisfaction; provided, however that the Director may for good cause grant a one-time extension of the removal and restoration period. Prior to permit issuance, the applicant shall provide the City a letter of credit, or other security instrument acceptable to the City, in an amount sufficient to cover the entire cost to remove the bypass pole and restore the surrounding area to the Director’s satisfaction. No more than one bypass pole may be installed per existing utility pole.
|