Extended Scope of Work/Notes:
|
(JJ2) REMOVE 1 WALL, CONVERT (E) BATH/CLOSET TO MASTER BATH, CLOSET AND POWDER ROOM. REMOVE RAISED BRICK FIREPLACE HEARTH. INSTALL NEW FLUSH NON-COMBUSTIBLE HEARTH. MODIFY 3 WINDOWS. DELETE 1 WINDOW. UPPER LEVEL-DIVIDE MAIN ROOM INTO TWO BEDROOMS AND NEW CLOSETS. REMODEL BATHROOM, REMOVE SGD AND BRIDGE. ENCLOSE 9.7 SQFT. OF EXISTING COVERED AREA FOR STORAGE. REPLACE 4 WINDOWS, MODIFY 4 WINDOWS & ADD 3 NEW WINDOWS.
|